What is the cost comparison of Kwik-Build Panels system vs. traditional construction?
Initial costs are very comparable, considering that a one-step installation replaces four separate operations of conventional construction: structural, insulation, sheathing, vapor and air barrier assembly. But more importantly, is the Life Cycle Energy savings as a result of a higher quality, longer lasting, resistant thermal envelope. And don’t forget to factor in the 28-35 % waste factor when trades people sort and cut lumber to size, and discard unused portions in landfills, adding further transport and dump fees.