Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is the best way to prepare a base for my Log Cabin or Garden Office?

0
Posted

What is the best way to prepare a base for my Log Cabin or Garden Office?

0

• A well prepared, flat, level base is essential to ensure a long lasting and stable installation. • Buildings should always have a base as large as their floor. We recommend that you lay the base in line with the outside edge of the walls of the building in order to aid drainage. • Your base level should lie 20-50mm above ground level. A solid base can be constructed in a number of ways, using a variety of materials: • Solid Concrete Base • Concrete Strip Foundations • Railway Sleepers • Paving Slabs on top of Hardcore • Decking Strip foundations will allow for better drainage than a solid concrete slab and should be laid running perpendicular to the building’s bearers. You will need to use a weed control membrane to prevent any plants that are growing between the concrete strips from coming up through the floor boards.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123