What is the best time to install Leaky Pipe into new landscape constructions?
The Leaky Pipe can be laid “to suit” on the soil surface after planting just prior to mulching. Where mulches are not intended, The Leaky Pipe can be laid 2-6″ below the soil surface by way of drawing narrow drills in the soil before planting. The exposed pipe in the bottom of the drill can then be covered at planting time, thus allowing the positioning of the pipes to be traced during planting. Drills can be made by the use of hoes or coulters drawn by hand or by tractor.