What is the average time that it takes to pump and pull a cable core from a cable using the Kabel-X process?
The pumping time is dependant on the length and type of cable. The preparation of the cable, pumping of the fluid, and the core removal usually takes between 1.5 to 5 hours per section. Additional time savings are realized through a shortened (or eliminated) permitting process, reduced time for site reclamation, as well as elimination of return truck rolls for the repair of collateral damage to water lines, pavement or concrete, electrical utilities, etc.