What is the average lead-time when ordering a PediTred?
A. Lead times vary in all manufacturing operations but generally Construction Specialties Inc. is able to ship a standard grid within three weeks from receipt of signed shop drawings. All submittal drawings will provide a proposed lead time. Please contact the factory if expedited service is needed.