What is the airport doing to address the airlines’ concerns about construction of the new terminal?
The Sacramento County Airport System met with the airlines many times over several years and successfully reduced the budget by $75 million. After numerous public hearings and design meetings which included the cost estimates, the Board of Supervisors selected the design that gives maximum flexibility – 50 years into the future – and is the least costly to build.