What is the advantage to a pre-engineered project or a permitted project?
• A pre-engineered or permitted project allows the excavator to avoid the requirement to update locate requests every 15 calendar days. If the excavator wishes to use this option, he must develop construction drawings that note all existing facilities within the project area. Any change orders that occur during the project must also be checked against the facility location to avoid conflicts with existing facilities.