What is required to prepare the area for a Visionaire FX system? Is it complicated?
No, it is not complicated at all. With the plug and play surface mount concept, your builder does minimal site preparation. A short synopsis for the builder is: • 1. Install electrical outlets and the track lighting. • 2. Paint the walls and ceiling to match the Visionaire FX design. • 3. Install the floor covering. • 4. Incorporate noise control measures as required. For the latest information, please request our Visionaire FX Builder Design Guide.