What is required to be done by the URM Ordinance?
The mandatory provisions of the ordinance have three elements which are required to be performed by January 1, 2006. These requirements are 1) Bracing of parapets around building perimeter, AND 2) Roof-to-Wall Ties/anchors around the building perimeter, AND 3) Removal or stabilization of any and all exterior building features which are falling hazards such as exterior stairways, balconies, marquees, cornices, statutes, etc. [SDMC, Sec. 145.0410].