What is required on the as-built survey?
The as-built survey MUST have the correct setbacks, the lot coverage percentage (including the home footprint and decking, pervious and impervious drives or walks, equipment stands, and is based on high-ground), and the roof ridge height. Incomplete surveys will not be accepted. Substitution of other official paperwork for any of this information is rarely allowed. Prior to submittal, please verify that the as-built survey is complete to prevent any unnecessary delays of the construction deposit refund.