What is required for fire alarm plan review submittal?
The Fire Alarm Permit and Plan Review Procedures must be followed. A minimum of 3 sets of design drawings, drawn to a recognized architects scale must be submitted, stamped, signed and dated with either a Texas Fire Alarm Planning Superintendent (APS) registered with the submitting company, or a Professional Engineer registered in Texas whose major discipline is Fire Protection Engineering (FPE). A minimum 2 copies of battery and voltage drop calculations as well as manufacturer’s specifications for all equipment installed must be provided. The Fire Alarm Plan Review Fee must be paid prior to plan review. A completed Fire Alarm Plan Review Request form (MS Word) (Adobe PDF) must also be submitted.