What is necessary to install GaiaRecycle?
Ensure that the area you select is well-ventilated (placed at least 8-inches from the wall) and protected from weather elements. Power requirements include 208 Volts or 480 Volts for larger systems, 3-phase (hard-wired or plug-in) plus the proper amps for your model (Please refer to the Specifications page). A licensed electrician is required for proper installation. It is essential that all operators read and understand the GaiaRecycle Operation & Maintenance Guide for their machine model.