What is meant by Simple Payback?
The payback is based on the total project cost and the electrical energy cost savings. The 1 to 10 year payback requirement is based only upon these factors. It is expected that there may be other cost savings due to reduced material waste, reduced labor, improved quality, or increased throughput. These items are not included in the payback calculations for this program.