What is left at a site where the AJT Process is used to clean it up?
The AJT Process lends itself to a complete makeover of the contaminated site. The final configuration depends on the results desired. Carried to completion, the AJT Process leaves a large hole in the ground in an area that is free from contamination. This excavation could be back filled, if desired, with the clean aggregate produced at that site. Additional clean soil can be added and the site landscaped as desired. An alternate use might be to grade and landscape the excavation to be a productive lake or pond. Because of its basic nature the AJT Process has the ability to take a very contaminated site and eventually turn it into a pristine location.