Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What is involved in Embarcadero Road traffic calming?

0
Posted

What is involved in Embarcadero Road traffic calming?

0

• The reduction of the street from two through travel lanes in each direction to one through lane in each direction with appropriate left-turn pockets at intersections, with the exception of maintaining the four-lane section in proximity to Middlefield due to capacity constraints • The replacement of traffic signals at St. Francis, Newell and Waverley with roundabouts (leaving the existing signals at Middlefield, Louis, Greer and Bryant) • Construction of a roundabout on Embarcadero Road at West Bayshore as a gateway feature. • The provision of marked bicycle lanes in each direction for the full length of the street, except in the blocks immediately adjacent to Middlefield, • The construction of a raised median in the center of the street; and, • Maintenance of the existing parking between St. Francis and Alma. The proposed Base Plan has two phases. Phase 1 would be a one-year trial of the plan, using temporary materials. Phase 2 would make the trial installation permanent. Where did t

0

• The reduction of the street from two through travel lanes in each direction to one through lane in each direction with appropriate left-turn pockets at intersections, with the exception of maintaining the four-lane section in proximity to Middlefield due to capacity constraints • The replacement of traffic signals at St. Francis, Newell and Waverley with roundabouts (leaving the existing signals at Middlefield, Louis, Greer and Bryant) • Construction of a roundabout on Embarcadero Road at West Bayshore as a gateway feature. • The provision of marked bicycle lanes in each direction for the full length of the street, except in the blocks immediately adjacent to Middlefield, • The construction of a raised median in the center of the street; and, • Maintenance of the existing parking between St. Francis and Alma. The proposed Base Plan has two phases. Phase 1 would be a one-year trial of the plan, using temporary materials. Phase 2 would make the trial installation permanent. Where did t

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123