What is involved in completing the factory assembled Dog Den 2?
A. The door assembly must be attached with ten bolts, nuts, and lock washers. Wood 2×4 (not included) skids must also be attached to the floor. The lid latches require attachment with two screws each, and the self sealing weather stripping must be attached to the top of the wall. All the necessary fasteners are included. Check the instructions on this site for details.