What is included with our steel framed homes?
Framed Home – Lock up Stage (Kit Home) Construction plans for submission to Council Engineered roof frame and wall frame Sizalation for external walls Colourbond roofcover and screws Anticon Blanket to roof Colourbond gutter, fascia, barges, ridgecap and downpipes Powdercoated aluminium windows and flyscreens Skillion verandah as per plans Verandah posts and beams Eave lining – except for verandahs External wall cladding (options available) All window and sliding door flashings Framed Home Built to Lock Up Stage Shire application, licence and approval fees Housing indemnity insurance 18 week maintenance Construction and public liability insurance All working and structural drawings All nails, bolts, tek screws, roof bracing, adhesives and fixings to lockup stage External balustrade in paint grade timber to 2nd storey balconies Treated timber reeded decking to 2nd storey balconies Delivery Labour to erect to lockup stage 6 year structural guarantee Concrete slab or framed floor system P