What is going to be done with this contaminated soil and free product?
The contaminated soil and free product will be disposed of in an appropriate offsite landfill or treatment facility. How long will excavation take? Excavation of this small quantity of soil and free product is expected to take two to three days. Work planned for November. In November, the Illinois EPA will conduct more work at the site in preparation for implementation of the final remedy in 2006. November work will include soil borings to determine the amount of soil that must be excavated and treated in 2006. Also, a temporary system will be installed on site to determine the amount of groundwater that will have to be pumped and the rate at which the groundwater will have to be treated. What is the final remedy for Source Area 4? The 2002 record of decision for Source Area 4 requires one remedy for soil and one remedy for leachate4. The soil remedy includes institutional controls3, soil excavation and on-site treatment of contaminated soils by low temperature thermal desorption5. The
Related Questions
- I have a friend who wants to use hexagonal water for a soil amendment product we are going to be manufacturing. Does the structured water unit create hexagonal water?
- Where are the PCB contaminated soil and debris going? What is the transportation plan and route?
- What is going to be done with this contaminated soil and free product?