What is ECOroads curing time?
ECOroads has a remarkably fast curing time. ECOroads does its work after the time of compaction and immediate subsequent curing (72 hours drying). Bonding of the soil particles takes place in the presence of moisture and compactive force. This condition will last as long as the material resists external forces. Heavy wheel loads, water, freeze-thaw cycles ultimately have an effect on all roads. ECOroads treated soils resists these forces due to the bonded, high density of the road material.