What is Design Locations and Design Locations requesting Markings?
A design ticket is a request for the member companies to supply plans, telephone response or physical markings within ten (10) days from the time of call, of their underground facilities involvement to the given area. A design ticket number will be issued to the caller at that time and if physical markings have been requested a comment will be placed on the that design ticket. If any type of excavation is being done at the time of the design ticket request, such as placing pins, the caller must also request an additional routine ticket, requesting markings for the 48 hours required by law.