What is a Sewage Treatment Master Plan?
The Wastewater facilities currently under the Department’s jurisdiction and included in this Sewage Treatment Master Plan, consist of the Bay Park Sewage Treatment Plant, the Cedar Creek Water Pollution Control Plant, and 37 sewage pumping stations throughout the County and the respective sewered areas they serve. When complete the Master Plan will serve as a valuable planning guide by mapping out a program of capital improvements designed to allow these Wastewater Facilities to operate reliably and comply with all laws/codes for the next twenty (20) year service period. Work associated with the study is considerable, but can be broken down to nine (9) key tasks. • consolidation • study/analysis of existing/future wastewater flow/loadings • existing facility capacity • existing facility condition • existing facility performance • future regulatory requirements • future capacity requirements • formation/screening/prioritization of capital alternatives recommending the necessary capital