What is a Building Regulation Application?
Before construction can commence you will be required to make a Building Regulation application. This will consist a set of technical drawings which will be at a scale of 1:50, and will include plans, elevations, sections and a specification and are expressly for the purpose of obtaining Building Control Approval. The proposal will be checked and approved by the Local Authority before work commences to prevent mistakes occurring on site. Once on site the Building Inspector will visit, inspect and sign off the various stages of the construction then issue a completion certificate at the end of the project to confirm that the project was constructed in accordance with the current standards. This certificate will need to produce when you sell the property.