What inspections are made by Washtenaw County Environmental Health during the construction of my well and sewage system?
Your inspection schedule will be listed on your permit. When you are ready for an inspection, call Environmental Health at (734) 222-3800. All inspections will be made promptly (usually within 24 hours, excluding weekends and holidays). Please note that any deviations from your original plans must be approved by Environmental Health before excavation/construction can begin! Typical inspections include: • Well Inspection: Well inspections are conducted during the sewage inspections. No specific appointments are needed for the well permit. • Excavation Inspection: An excavation inspection is required on all drainfields. Call Washtenaw County Environmental Health at (734) 222-3800 when the excavation is ready. The Sanitarian must inspect the excavation before you place any sand fill or stone in the drainfield. This inspection ensures that the size and location of the drainfield are appropriate, and ensures that suitable soil conditions are available. • Final Inspection: After the field is