What if the supplier does not meet the minimum Addendum 1 requirements when they are contractually obligated to do so?
In order of increasing severity: the Boeing representative could write a Supplier Evaluation Report (SER) requiring corrective action within 30 days; Addendum 1 could be removed from supplier contracts, and the supplier would be ineligible to bid on or perform work for which Addendum 1 is required; the supplier could be put on probation; the supplier could be withdrawn.