What happens to the Towns septic tanks if the treatment plant is built?
The tanks would remain. In fact, two additional septic tanks would need to be installed at each pump station during Phase 2 to handle the additional flows. We would plan to have these tanks priced out as alternates during Phase 1 and make a determination to install them during Phase 1 if there’s available budget.