What happens if I make a manual change to the PDC report without submitting a corresponding cost transfer?
Information to be confirmed must be consistent with the Labor Distribution and Oracle Systems at the time the report was generated and/or confirmed. The Office of Cost Studies will verify all manual changes made to the PDC Reports and if the changes do not agree with the ORACLE and Labor Distribution System, then the Office of Cost Studies will contact you.