What Guidelines should I follow when working with and installing Woodhouse Perimeter Mouldings?
A. Ensure that all Perimeter Mouldings are kept dry on site prior to installation. Real wood fibre is used in the manufacture of the Perimeter range and it is advised to follow standard practices whilst handling timber and wear gloves, goggles and dust masks as required. Ensure that a sharp carbide tipped drop saw is used for cutting all Perimeter mouldings especially angles and the pressure of all finishing guns is set at a maximum of 120PSI (less if required) when fixing.
Related Questions
- What happens if I don follow CEF guidelines, use lower quality product, or use a lesser quantity than approved by CEF?
- What Guidelines should I follow when working with and installing Woodhouse Perimeter Mouldings?
- Treatment of cardiac risk factors in diabetic patients: How well do we follow the guidelines?