What fees are required?
As noted above, the fee for an initial application for an OTI license is $825. The fee for applications for changes in operations that require the reissuance of a license is $525. When applying for both NVOCC and ocean freight forwarder authority on the same application, the filing fee is $825. All payments may be made by money order, certified check, cashiers check, or personal check made payable to Federal Maritime Commission. Please do not send cash. Failure to include the proper fee with your application will cause it to be returned without processing. Fees will not be refunded in any instance where the application has been processed in whole or in part.
Fees for permits range from $200.00 to as much as $3,000.00 for a PSD construction permit. Back to Top How will my application be processed? When applications are submitted, the Section reviews them for completeness. The applicant is notified in writing of any deficiencies. When the necessary items are complete, a draft permit is prepared. Notices of minor source draft permits are published for public review. Major source draft permits go through a public review process where the public, affected states and the EPA’s comments are solicited. A public hearing is held if significant interest is displayed. After considering public comments and a final supervisory review, a final decision is made, and the permit is issued or denied. Under state law, a construction permit for a minor source must be issued within 115 days after receipt of a complete application. For major sources, the permit is to be issued within six (6) months after receipt of a complete application. The entire permit proce
Fees are required for construction of new facilities, the expansion or modification of existing facilities, plans approval, and / or site evaluation. • Well or spring development: $200 each • Chemical control plant: $400 • Disinfection systems • gaseous: $300 • hypochlorinator: $150 • Filter plant: $1000 • Pump stations: $250 each • Tanks: $225 each • Standard specification: $100 • Tank recoating: $50 each • Sludge treatment and handling: $150 • Water lines: • 1000 feet or less – $100 • Over 1,000 feet: $100 + $0.01 for each foot over 1,000 • Change orders: $50 each • Operation and Maintenance Manual: $150 • New Water Source and Site Evaluation: $300 • Site Evaluation for Water Plant Sludge Application: $300 • Miscellaneous (engineering reports, addenda, etc.): $50 each Annual facility maintenance fee invoices are mailed to each water utility at least 45 days before the due date. Fees vary depending on the type of system and the number of connections. What Are My Rights And Responsibil
You must pay a Processing Fee and a Right of Citizenship Fee when you submit an application for Canadian citizenship. The total fee required for this application is $200.00. Both of the following fees must be paid when submitting an application for Canadian citizenship (Adult): • Processing Fee: $100 for each person. • Right of Citizenship Fee: $100 for each person 18 years of age or older.