Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What factors must be considered in risk analyses conducted to determine if additional preventive or mitigative actions are needed?

0
Posted

What factors must be considered in risk analyses conducted to determine if additional preventive or mitigative actions are needed?

0

An operator must consider all risk factors relevant to a particular pipeline segment. This includes risk factors that influence both the likelihood and the consequences of pipeline failure. This would include: design and construction information maintenance and surveillance activities, operating parameters and operating history right-of-way information, information about the population and the environment near the pipeline, etc. The rule specifically identifies several risk factors that should be considered including: terrain surrounding the pipeline segment, including drainage systems such as small streams and other smaller waterways that could act as a conduit to the high consequence area; elevation profile; characteristics of the product transported; amount of product that could be released; possibility of a spillage in a farm field following the drain tile into a waterway; ditches along side a roadway the pipeline crosses; physical support of the pipeline segment such as by a cable

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123