What does the operator need to set/adjust on the equipment?
Following installation and commissioning by an authorised service engineer, there are only a small number of things to check. The user must monitor the concentration of chlorine dioxide in the water pipe and adjust it if necessary. The only other things to keep an eye on are maintenance intervals and the signal indicating that more chemicals are required.