Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What determines acceptance of a power boiler in Indiana what will meet the requirements for certification in accordance with Section 1 of the ASME Code?

0
Posted

What determines acceptance of a power boiler in Indiana what will meet the requirements for certification in accordance with Section 1 of the ASME Code?

0

The state inspector will determine acceptance based on a comparison of ASME certified documents with the installed boiler to ensure the complete boiler unit is properly certified. The boiler proper and the boiler external piping defined in Section 1 of the ASME code comprise a “complete boiler unit” that must be certified by stamping and/or documentation. Note: Code jurisdiction (and certification) may differ depending upon the number and type of boilers installed and depending upon the configuration of the system.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123