What determines acceptance of a heating boiler in Indiana that will met the requirements for certification in accordance with Section IV of the ASME code?
The state inspector will determine acceptance based upon the stamping and/or documents provided during the initial inspection of the heating boiler. The installed boiler will also be compared with Article 6 (instruments/fittings/controls) and Article 7 (installation requirements) of Section IV ASME code to ensure that the required instruments and controls have been installed properly. The inspector will check fittings supplied by the installing contractor to ensure they meet applicable standards and system requirements for pressure and temperature.
Related Questions
- What determines acceptance of a heating boiler in Indiana that will met the requirements for certification in accordance with Section IV of the ASME code?
- What determines acceptance of a power boiler in Indiana what will meet the requirements for certification in accordance with Section 1 of the ASME Code?
- What are the requirements for acceptance into the Teacher Certification program?