Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What detailing is required for a typical lagging wall with DMX Drain 6000?

DETAILING dmx drain lagging wall
0
Posted

What detailing is required for a typical lagging wall with DMX Drain 6000?

0

For straight forward lagging wall installation the main details to watch for at the interface of the DMX Drain 6000 are the post tensioned cable points, seam overlaps of the Drainage Geocomposite, taping of the seams in the DMX Drain 6000, wrapping of geotextile over the top of the plastic core, attachment of the DMX Drain 6000 to the structural substrate, discharge of collected water at the bottom of the DMX Drain 6000. These details are covered in our Installation Manual and as downloads in DWG or PDF drawings on our web site. These details are the most important ones to remember.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123