What construction work was necessary before operations started at the damsite?
(1) Construction of Boulder City to house both Government and contractor employees; (2) construction of 7 miles of 22-foot wide, asphalt-surfaced highway from Boulder City to the damsite; (3) construction of 22.7 miles of standard-gauge railroad from the Union Pacific main line in Las Vegas to Boulder City and an additional 10 miles from Boulder City to the damsite; and (4) construction of a 222-mile-long power transmission line from San Bernardino, California, to the damsite to supply energy for construction.