What can be done top make our current fixtures more efficient, i.e. less rejects and last longer?
These are two separate items but are in close relation with one another. Rejects may be caused by incorrect materials, difficulty in loading and unloading, inability to hold the part correctly, weight or position of part on the rack. These items can also have a direct affect on the life of the rack. For us to recommend areas of improved performance and life cycle, we must take the time to evaluate all aspects of your process before we can provide a viable alternative to your current fixtures. Give us a call and we will send a design and sales engineer to your facility for a not cost evaluation of your problem areas.