What can be done to mitigate construction-related noise?
It is unavoidable that demolition and construction are noisy. To reduce noise and mitigate the impact on neighbors, the project team will use the quietest equipment available and load and unload all trucks on the site (rather than on the street alongside the site). The first two weeks of demolition (the first and second weeks of July 2009) will be the noisiest phase of the project.