What are traffic control zones and how should I react?
Whenever construction is in progress on or near the roadway, drivers face rapidly changing traffic conditions. These changes can be hazardous for drivers, workers and pedestrians unless protective measures are taken. An orange, diamond-shaped warning sign typically tells motorists of an approaching traffic control zone. These signs inform motorists of construction, maintenance and utility operations, but can include work activities such as survey crews and temporary weighing stations. Traffic control zones are divided into several areas to increase safety for both workers and motorists. The areas include: • Advance Warning Area – tells motorist what to expect. • Transition Area – moves traffic out of its normal area. • Buffer Area – provides protection for traffic and workers. • Work Area • Termination Area – lets traffic resume normal driving. When traveling through these control areas, always be alert for workers and decrease your speed to increase safety.
Related Questions
- Traffic control plans phase 6B and 6C indicate a need for temporary traffic barriers. How will the contractor be paid for temporary traffic barriers?
- Does The Department Have Standards For Appearance And Use Of Traffic Control Devices In Highway Work Zones?
- Do I need to submit a traffic control plan along with off-site roadway improvements?