What are the Town requirements for maintenance accessways to stormwater management facilities?
Per DCSM Section 5-380.3, maintenance access ways to stormwater management facilities must have a minimum width of 12 feet with a 2% maximum cross slope and a 12% maximum longitudinal slope. Maintenance access ways must be constructed of with shot rock, grasspave, or other similar material, and must be kept clear of all physical obstructions such as shrubs, trees, buildings and fences. Additional access requirements will also apply when a combined spillway has been used.