What are the time and cost differences between the models?
Each model is different in terms of time and cost. As one might expect, comprehensive planning requires the most time and is the most expensive of the 3 models. Using comprehensive planning as the benchmark (i.e., equal to the factor of one), it is possible to make approximate time and cost comparisons between the 3 models.