What are the steps involved in building a pool?
Swimming pool construction includes many steps, beginning with an experience-based design process. Once the design has been approved, we have the existing utilities marked to ensure that there is no conflict with the project plans. We lay out the pool. During this phase, we paint the ground and drive in wooden stakes to reflect the outer contour of the pool. Next, our excavation crew comes out. We verify the grade and excavate the pool area. The next day, our steel crew installs the reinforcing steel bars. During this process, our plumbers stub in the plumbing. The following day, our gunite crew comes out to pneumatically apply the pool shell. Our plumbers return the next day to install the remaining plumbing. Next, we send our electrician out to hook up the electrical lines. Tile and coping is then applied, followed by decking and plaster. The entire process is quite involved, and sometimes requires some deviation from the standard format. Each pool is unique and requires attention to