Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What are the start-up requirements for a new treatment facility or system?

0
10 Posted

What are the start-up requirements for a new treatment facility or system?

0
10

• A new or modified treatment facility or system utilizing a complex or novel treatment process or very large facilities such as surface water treatment plants require the submission of a Start-up Plan for review and approval by the Water and Wastewater Treatment Program. A Start-up Plan may not be required for a simple treatment process or for a small facility as the start-up requirements may be specified on the Approval To Construct certificate. Start-up requirements will be determined on a project-by-project basis by the Water and Wastewater Treatment program. Prior to start-up the following action items must be completed: • Submission of an Approval Of Construction Application • Submission of an Engineer’s Certificate Of Completion Form • An approved Start-up Plan (if required) • A draft O&M manual (minimum content is startup, shutdown and emergency procedures) • Certified bacteriologic lab reports • Construction test documentation (pressure or leak tests, etc.) • Instrument calibr

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123