Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What are the special requirements for construction in “V” Flood Zones in Unincorporated Charleston County?

0
Posted

What are the special requirements for construction in “V” Flood Zones in Unincorporated Charleston County?

0

Lowest Horizontal Member Elevation: The lowest horizontal structural member of all new and substantially improved structures must be elevated to a minimum of one foot above the base flood elevation indicated on the applicable flood insurance rate map. A flood elevation certificate indicating this elevation must be submitted prior to any building inspection, except for a foundation inspection. This certificate must be of the latest version available. Plan and Certificate Requirements: Wall section and foundation plans for structures in “V” flood zones must be designed and sealed by a South Carolina Registered Professional Engineer and/or Architect. Plans must detail breakaway wall construction, foundation design, and scour depth. If spread footings are used, the bottom of the footing must be a minimum of 12 inches below the anticipated scour depth at the structure location. Pre-construction “V-Zone design” and “V-Zone Breakaway wall” certificates must be submitted with the construction

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123