Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What are the requirements for installation and operation premises? Is planning needed?

0
Posted

What are the requirements for installation and operation premises? Is planning needed?

0

AQUACHLOR can be stationed (without planning, installation and construction works) in the existing chlorination premises or in any heated premises equipped with combined extract and input ventilation with air change intensity not less than single volume of the premises per hour. Space required for assemblage, operation and technical servicing of one AQUACHLOR-500 device should be not less than 7 square meters including space needed for brine and acid HCl (for reactor cleaning) preparation and supply unit. Water pressure line (from 3 to 6 kgs/sm2), sewer, power circuit of 220 W in the premises is obligatory. What is AQUACHLOR’ output capacity? AQUACHLOR devices are manufactured as modules their oxidants’ output capacity being 30, 50, 100 and 500 g/h. Increase of output capacity of the devices can be reached by way of simultaneous operation of group of modules having output capacity of 500 g/h joint in unified hydraulic system with given oxidants output capacity. How to control AQUACHLOR

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123