What are the regulations in Crook County for installing a Septic System?
According to Resolution No. 9-2004, any Small Wastewater Treatment Facility (septic system or drainfield) in Crook County must be inspected by a County Designee. This inspection must happen BEFORE the installation is complete. In Crook County, this person is now employed through the Growth and Development Office. Please call Fred Duncan at: 307-283-1540. The steps involved in permitting a septic system are outlined in a document developed by CCNRD. Click here to download this document. We have also created a flow chart developed by CCNRD in coordination with Ralph Goodson. To download this document click here. For a list of contractors/installers in the area who are familiar with this process, please call the office.