What are the procedures regarding a change in personnel who were listed in the SPCC Plan (or other non-technical Plan changes)?
Non-technical type changes (such as a change in personnel listed in the plan, change in phone numbers, etc.) can be noted in the SPCC Plan by writing in the updated information by hand. Certification of a PE is required only for technical changes (such as those that would materially affect the facility’s potential to discharge oil).