What are the power requirements for the Plasma CD systems?
• The current versions of Plasma CDI systems need a minimum of 6.2 volts to start operation. This is more than 2 volts less than the minimum voltage needed by the starter solenoid, thereby eliminating the possibility of kick-backs during starter operation. Plasma systems shipped before December 20 of 2004, need 8.5 volts to start operation. This higher “on” voltage can cause a misfire if the starter current drain is high and/or the battery is weak and the voltage collapses below this threshold during cranking. Systems shipped before 2005, can be upgraded to have the lower voltage capability. Once the engine is running, all systems operate down to less than 5 volts, should you lose your charging system.