What are the parking garage options under consideration?
In brief, there are five options under consideration, which can be reviewed in detail at the Ardmore Transit Center page. Option 1: Features the smallest Main Street Garage (7 levels) and includes a larger Bernicker Garage (5 levels.) Option 2: Features the largest Main Street Garage (8 levels), demolition/upgrade of the PSB Addition* and no Bernicker Garage. Option 2A: Same features as Option 2 but builds over PSB Addition. Option 3: Features shorter Main Street Garage (7 levels), demolition/upgrade of the PSB Addition and a small Bernicker Garage (3 levels). Option 3A: Same features as Option 3 but builds over PSB Addition. * Options involving demolition of the PSB Addition would re-build with one level below grade and one level at grade. • How were the five parking garage options determined? Given the limited amount of land, there are limited viable options. Dozens of parking garage options, however, have been studied by parking experts during the past year. Inefficient, impractical