What are the parameters of the protocols listed in §18.3(d)?
The Safety Division interprets §18.3(d) of Chapter 18, Title 16 Texas Administrative Code as follows: • The interval between each notice refers to the time allotted for the marking of the facilities. For example, if an operator and excavator agree to an interval of 7 days, the excavator must contact the notification center every 7 days to ensure that the marks are properly refreshed. • The scope of the ticket refers to the area being excavated and specifically the description of the project provided on the ticket. • The life of a ticket refers to the length of time a ticket will remain “open” or valid. For example, for a large project requiring several months to complete, the operator and excavator may agree upon a specific time period, such as 90 days. • The schedule of excavation work refers to the manner and the timing of excavation activities.