What are the options for Subcontract Plan and what do they mean?
The FPDS-NG specifications are as follows. Any additional questions regarding why something is or is not appropriate for the action you are entering should be researched in the FAR. • Plan Not Included – No Subcontracting Possibilities – A Subcontracting Plan was not included in the contract because subcontracting possibilities do not exist (FAR 19.705-2I) • Plan Not Required – No Subcontracting Plan was required. (For example, the action did not meet the dollar thresholds in FAR 19.702(a)) • Plan Required (Pre 2004) • Plan Required – Incentive Included – Includes a Subcontracting Plan and also includes additional incentives (FAR 19.702(a), FAR 19.708(c), and DFARS 219.708(c)) • Plan Required – Incentive Not Included – Includes a Subcontracting Plan, but does not include additional incentives (FAR 19.702(a) and FAR 19.708(c)).