If the alignment options developed during the Alignment Study are determined to have public, agency, and local political support, they can be advanced through a more formal environmental review. The environmental process would identify a Preferred Alternative. If one of the proposed alignments is identified as the Preferred Alternative, and a funding plan is in place to build the arterial or a segment of the arterial, then final project design can begin.